According to an agreement between the state and Joby Aviation Inc., production of cutting-edge electric planes with vertical takeoff and landing will soon begin in the same Ohio River valley where the Wright brothers first experimented with human flight.
"When you're talking about air taxis, that's the future," Republican Gov. Mike DeWine told The Associated Press, adding, "We find this very exciting¡ªnot only for the direct and indirect jobs it will create but also because, like Intel, it signals to people that Ohio?is looking to the future." This is significant for us."??
Electric vertical takeoff and landing, or eVTOL, aircraft are becoming more common worldwide; however, concerns about noise levels and charging requirements remain.?Nonetheless, developers claim the planes are getting closer to providing a large-scale option to carry individuals or small groups from rooftops and parking garages to their destinations while avoiding the clogged thoroughfares below.
Joby's choice to put its first scaled manufacturing facility near Dayton International Airport on a 140-acre (57-hectare) site builds on two decades of groundwork created by the state's leaders, according to Republican Lt. Gov. Jon Husted.?
Notably, the location is close to Wright-Patterson?Air Force?Base and the United States Air Force Research Laboratories headquarters.?"For a hundred years, the Dayton area has been a leader in aviation innovation," Husted said.
Husted added, "However, capturing a large-scale aircraft manufacturer has always eluded the local economy there." That aim has been realized with this news."
Orville and Wilbur Wright both lived and worked in?Dayton. They established the first American airplane factory there in 1910. Joby's formal announcement Monday took place at Orville Wright's home, Hawthorn Hill, and finished with a ceremonial flypast of a replica of the Wright Model B Flyer.
Joby's production aircraft can transport a pilot and four passengers at up to 200 miles (321.87 kilometres) per hour and has a maximum range of 100 miles (160.93 kilometers). According to the business, its modest noise profile is barely discernible against the backdrop of most cities.?
Beginning in 2025, they will be integrated into?aerial?ridesharing networks.?The manufacturing facility's construction is anticipated to commence in 2024, with production beginning in 2025.?Partnerships with Toyota, Delta Air Lines, Intel, and Uber help the Santa Cruz, California-based company's operations.?Joby is a 14-year-old startup that went public in 2021 and was the first eVTOL company certified by the United States Air Force for airworthiness.
Through the JobsOhio economic development office, the state of Ohio and local governments are providing up to $325 million in incentives for the $500 million project.?
Joby intends to use the funding to construct an Ohio factory that delivers up to 500 aircraft per year and creates 2,000 jobs.?The U.S. Department of Energy has asked Joby to apply for a loan to help fund the facility's development as a sustainable energy project.?According to Joby CEO JoeBen Bevirt, the company chose Ohio after a lengthy and competitive search.
Its financial package wasn't the most generous, but the opportunity to transfer the operation to the cradle of aviation¡ªwith an experienced crew¡ªsealed the deal, he added.?
"Ohio is the number one state in terms of supplying parts to Boeing and?Airbus," Bevirt added.
"Ohio ranks third in the country for manufacturing jobs, and that depth of manufacturing expertise, that workforce, is critical to us as we look to build this manufacturing facility."?J.P. Nauseef, President and CEO of JobsOhio, stated that the company's commitment to aviation has seen the Dayton area through difficult economic times.
Tens of thousands of auto and auto parts manufacturing jobs were lost in the early 2000s, and the headquarters of ATM manufacturer NCR Corp. was relocated to an Atlanta suburb in 2009.
"This marries that heritage and legacy of?aviation innovation with our nuts and bolts of manufacturing," Nauseef explained.?
Bevirt stated that operations and hiring would begin immediately from existing facilities near the development site, subject to the usual legal and regulatory hurdles being cleared.?The property is large enough to handle 2 million square feet (18.58 hectares) of manufacturing space in the future.
Toyota, a long-term investor, collaborated with Joby in 2019 to build and launch its pilot production line in Marina, California.?According to the corporation, the automaker will continue to help Joby as it prepares for scaled production of its commercial passenger flying taxi.
The statement comes as a bipartisan group of Ohio congressional lawmakers has lately increased their efforts to entice the United States Air Force's future U.S. Space Command headquarters or Space Force troops to relocate to Ohio.?State leaders also mention the Wright brothers' aerospace legacy and Ohio-born astronauts John Glenn and Neil Armstrong.
What do you think about it? Do let us know in the comments.
For more trending stories, follow us on Telegram.